Blog
Discover our latest articles and blogs

Side Returns: West Midlands Victorian Terraces Need Heritage First
Planning a side return for a West Midlands Victorian terrace? Check conservation status, party wall duties, costs, and design choices before building.

Right to Light: Check UK Extension Risk Before You Build
Check right to light risk before a UK extension with a surveyor, learn how 20 years of light can create a right, and reduce redesign and claim risks.

UK Kitchen Extension Timeline: Why Planning Can Take 8 Weeks
Most UK kitchen extensions take 6 to 12 months. Learn planning, building regulations, and construction timelines, plus ways to prevent approval delays.

L Shaped Extension Design: Add Room, Keep Garden Depth in the UK
Explore L shaped extension design ideas for layouts, glazing and materials, with UK planning rules, realistic costs, and a managed design and build option.

Boot Room Extension: 3 Layouts, UK Rules, and Builder Questions
Plan a low maintenance boot room extension with three practical layouts, UK planning and Building Regulations checks, and questions to ask your builder.

UK Extension Contingency Budget: Why 10% Can Fall Short
Plan a UK extension contingency with a ready to use calculation, see when 10% is enough, when to increase it, and how to manage funds as work progresses.

Roof Lantern vs Skylight: UK Rules, 150mm Limit, One Contractor
Compare roof lanterns and skylights for UK homes, covering costs, planning rules, the 150mm limit, and how one contractor coordinates the build.

UK Homes: Underfloor Heating vs Radiators for Extensions or Retrofits
Compare underfloor heating and radiators by project stage: wet systems suit extensions and heat pumps, while radiators avoid floor work in finished rooms.

House Extension Costs in Birmingham: Why Quotes Need a 10–15% Buffer
See Birmingham house extension costs, local per square metre benchmarks, worked examples, quote checks, and why a 10% to 15% contingency protects your budget.