Blog
Discover our latest articles and blogs

Semi Detached Extension Ideas: Avoid Planning and Party Wall Surprises
Compare rear, side return, wrap around, and loft ideas for semi detached homes, with UK planning, party wall, budget, and design and build guidance.

Flat Roof vs Pitched Roof: Which UK Extension Costs Less Long Term?
Compare flat and pitched roofs for a UK extension, weighing upfront cost, long term maintenance, planning fit, and 2026 insulation rules before you build.

Open Plan Kitchen Extension: £82,500 Example, UK Rules, One Team
Plan a UK open plan kitchen extension with layout ideas, a £82,500 example for 30m² before VAT, permission checks, and one accountable design and build team.

Timber Frame vs. Brick: Days vs. Weeks for West Midlands Extensions
Compare timber frame and brick for a West Midlands extension, from build speed and Part L performance to embodied carbon, planning, costs, and delivery.

6 Steps to Run the 45 Degree Check for UK Homeowners: Practical Fixes
Practical UK homeowner guide to the 45 degree screening test. Six steps to run the check, simple design fixes and local case studies to keep planning on...

UK Part F: 30 l/s kitchen ventilation rules for owners & builders
Part F guide for UK homeowners and builders. Learn the 30 l/s and 60 l/s extract rules, the 20 l/s open flue limit, and the commissioning checks building...

20–40% Premium: Triple vs Double Glazing for UK Homes
UK guide to double vs triple glazing: when a 20–40% premium pays, and how Approved Document L and the 25% glazing rule affect extensions.

Check Permitted Development: Conservatory or Extension for UK Homes
Decide between a conservatory or extension for UK homes. Compare cost and build time, and avoid planning or building regs surprises

4–8 Week Temporary Kitchen Renovation: Stay Cooking in Your UK Home
Stay cooking during a 4–8 week UK kitchen renovation. Practical steps: a 4 appliance kit, Part P compliant power and agreed trade schedules.