U-Values for Extensions: What England Requires in 2026

November 22, 2026
U-Values for Extensions: What England Requires in 2026

For a new extension in England, the walls must achieve a U-value of 0.18 W/m²K, the roof 0.15, the floor 0.18, and windows and most doors 1.4. These are maximums set by Approved Document L, the part of the Building Regulations that covers energy. A U-value measures how fast heat escapes through a surface, so a lower number means a warmer room. The design has to hit these figures before a spade goes in the ground. We design and build extensions across Birmingham, Solihull and the wider West Midlands, and we handle the planning and building regulations side as part of one managed project.

Extensionkings
Plan an Extension Around the Rules
Extension Kings designs and builds bespoke extensions, managing planning and building regulations across Birmingham, Solihull and the wider West Midlands.
Visit

TL;DR

  • New extension elements in England must not exceed: walls 0.18, roof 0.15, floor 0.18, windows 1.4, rooflights 2.2 W/m²K.
  • Windows, rooflights and doors together should not exceed 25% of the extension's floor area. Go beyond that and you need a calculation to prove compliance.
  • The 2021 rules (in force from 15 June 2022) and the 2026 edition (from 24 March 2027) use the same limits for extensions.
  • The weak points are usually the junction with the old house and the flat roof build-up, not the wall itself.
  • These are maximums. Designing a little better than the limit is common practice.

Table of Contents

What a U-value actually tells you

A U-value is the heat flowing through one square metre of a surface for each degree of temperature difference across it, written in W/m²K. The Open University gives indicative figures of 4.8 for single glazing and 2.0 for some low-e double glazing. Walls and roofs sit far lower, which is why the numbers in the regulations look so small.

For you, a lower U-value means less heating needed to keep a kitchen-diner or bedroom comfortable, and fewer cold surfaces where condensation forms. The regulations set a ceiling. How far below it you go is a design choice.

The maximum U-values for a new extension in England

The table below shows the limits for new elements in an extension to an existing home, from Approved Document L Volume 1.

ElementMaximum U-value (W/m²K)
Walls0.18
Roof (pitched or flat)0.15
Floor0.18
Windows1.4 (or Window Energy Rating Band B minimum)
Rooflights2.2
Doors with more than 60% glazing1.4 (or Doorset Energy Rating Band C minimum)
Other doors1.4 (or Doorset Energy Rating Band B minimum)

The same limits are repeated in Harrow Council's guidance for work after 15 June 2022. A Window Energy Rating is a label that grades a whole window on its energy performance, so a window can pass either by its U-value or by its band.

These figures apply to England. Scotland, Wales and Northern Ireland have their own regulations, so a quoted figure from another nation may not match.

Old walls, floors and roofs are treated differently

If your project also upgrades part of the existing house, for instance insulating a retained wall that is being opened up, different limits apply. Insulation Warehouse Direct summarises them as 0.16 for roofs, 0.30 for walls with added insulation, 0.55 for cavity fill and 0.25 for floors. TradeCalculator adds that replacement windows fall under the new-element figure of 1.4. These are separate from the extension itself, which always uses the stricter table.

U-value figures for existing building upgrades

What those numbers mean in bricks and insulation

A figure on its own does not tell you what to build. Typical constructions give a feel for the thickness involved.

  • Walls: CNC Building Control gives one route to 0.18: a 100mm insulating block, 100mm of insulation and 100mm of brickwork.
  • Pitched roofs: the same guide suggests 250 to 300mm of quilt insulation in two layers to reach 0.15.
  • Flat roofs: a warm roof, with rigid board above the joists, is the practical route, because the insulation needed to reach 0.15 is thick.
  • Timber frame: Home Energy Quotes says mineral wool between studs with external rigid PIR board is common. It also puts typical rigid insulation at 100 to 150mm in walls, 150 to 200mm in roofs and 100mm under floors.

Thickness matters inside the house too. A thicker roof build-up eats into ceiling height, which is a real issue on low-pitch extensions. Our guide to warm versus cold roofs explains how to keep headroom, and flat versus pitched roofs compares the long-term costs.

Glazing: the 25% rule and bi-fold doors

Families planning a bright kitchen-diner usually want a lot of glass, so this is where the rules bite. Windows, roof windows, rooflights and doors together should not exceed 25% of the extension's floor area, plus the area of any existing openings the extension covers over. CNC Building Control says the area of covered openings is deducted when you count.

A worked example

Take a 20 m² rear extension. Twenty-five per cent is 5 m² of glazing and doors. A set of bi-fold doors 3 m wide and 2.1 m high is 6.3 m² on its own, before any windows or rooflight. That is over the limit, so you would need to show compliance another way.

Going over 25%

There are two recognised routes, explained by TradeCalculator from paragraphs 10.9 and 10.10 of the Approved Document:

  1. Area-weighted U-value: the average U-value of all the extension's thermal elements must be no worse than a notional extension of the same size and shape with 25% glazing.
  2. SAP calculation: the Standard Assessment Procedure, a government energy model, shows the house with its extension performs no worse than with that notional extension.

Stratford Council's bulletin notes that highly glazed extensions need design calculations before works start, and that this may mean specifying better U-values elsewhere. Home Energy Quotes puts a SAP calculation at £150 to £400 depending on complexity. In practice, that means glazing decisions are made at design stage, not after the structure is drawn.

Glass specification affects both comfort and running costs. Our comparisons of low-E and clear glass and triple and double glazing help you weigh the options. When you buy windows, a window U-factor guide explains why you should ask for the whole-window figure, glass and frame together.

How U-values are calculated and what building control wants

Approved Document L requires U-values to be assessed using the methods in the BRE's BR 443, with BS EN ISO 6946 for walls, roofs and floors and BS EN ISO 10077-2 for windows and doors. For a window, the figure covers glazing and frame combined. BR 443 includes repeating thermal bridges such as timber studs in the component U-value, while junction losses are modelled separately.

A thermal bridge is a path where heat bypasses the insulation. Hertfordshire Building Control says manufacturer solutions are backed by calculations accredited under the BBA Competency Scheme for U-Values or an equivalent, and that continuous insulation and reasonable airtightness are essential to achieve the stated performance.

The most frequently mishandled spot, according to Home Energy Quotes, is where the extension meets the old house, where poor detailing can cause cold spots, condensation and mould. The inspection route matters here too: see our explainer on building control versus an approved inspector.

How U-values are calculated and what building control wants

What changed from the older rules

The 15 June 2022 changes were a step toward the Future Homes Standard. CNC Building Control's booklet shows how extension limits moved:

ElementBeforeNow
New floors0.220.18
New cavity or timber-frame walls0.280.18
Pitched roof, flat ceiling0.16 / 0.180.15
Windows1.61.4

A 2026 edition of Approved Document L takes effect on 24 March 2027 for non-higher-risk work, with transitional arrangements. According to SiteHelm, the limits for new elements in existing dwellings are the same in both editions. Your building control body will confirm which edition applies to your start date.

Designing a little better than the limit

The figures are maximums. Home Energy Quotes observes that many builders and architects now design to beat them, expecting further tightening. Glazing Today adds that elements, glazing included, often have to outperform the limiting values to reach overall energy targets. Heating choices also affect how the finished room feels, as we cover in underfloor heating versus radiators.

Our view on U-values

U-values are rarely a problem on paper. They become a problem when the drawings, the glazing order and the site team are separate parties who each assume someone else checked the numbers.

That is why we run design, planning, building regulations and construction as one team. The glazing area is settled alongside the layout, the roof build-up is agreed with the ceiling height in mind, and the junction with your existing house is detailed before anyone is on site.

We also give you a realistic budget before any site survey, so the cost of better insulation or a larger set of doors is part of the conversation from the start, not a surprise in the middle of the build.

Raja

Getting your extension designed to pass first time

If you are planning a kitchen-diner, an extra bedroom or a wrap-around extension in Birmingham, Solihull or elsewhere in the West Midlands, we take the project from first consultation to handover, including planning and building regulations. Talk to us about your extension and we will set out what your design needs to achieve.

Extensionkings

For a sense of budget, see our guide to extension cost per square metre. Over-garage projects are covered on our extension costs page.

FAQ

What U-value does an extension wall need?

In England, new extension walls must achieve no more than 0.18 W/m²K. One typical build-up is 100mm insulating block, 100mm insulation and 100mm brickwork, as shown in CNC Building Control's guide.

Do my windows need a particular U-value?

Yes. Extension windows need a whole-window U-value of 1.4 W/m²K or better, or Window Energy Rating Band B minimum. Rooflights can be up to 2.2.

Can I have large bi-fold doors?

Yes, but if openings exceed 25% of the extension floor area you must show compliance through an area-weighted calculation or SAP. This is decided at the design stage.

Are the rules different in 2027?

The 2026 edition of Approved Document L takes effect on 24 March 2027 for non-higher-risk work, but the limits for new extension elements stay the same as the 2021 edition. Your building control body can confirm the edition for your start date.