Blog

Discover our latest articles and blogs

Make Every Metre Count: 12 Small Kitchen Extensions for UK Homeowners
September 21, 2026

Make Every Metre Count: 12 Small Kitchen Extensions for UK Homeowners

12 practical small kitchen extension ideas for UK homeowners. Buildable, contractor ready layouts with cost guidance and case studies.

3.6–3.8m opening or calmer view? Bifold vs sliding doors for extensions
September 20, 2026

3.6–3.8m opening or calmer view? Bifold vs sliding doors for extensions

Decide in one read which door suits your UK extension. Compare clear opening, costs (£1,500–£6,000), weatherproofing, maintenance and fitting time.

What does a house extension cost per square metre in 2026?
September 19, 2026

What does a house extension cost per square metre in 2026?

Use TradeMatch 2026 rates to turn headline £/m² into a realistic West Midlands extension budget. Regional prices, specification bands, statutory extras...

2026 UK Extension Costs: Real All in Prices by Type and Region
September 18, 2026

2026 UK Extension Costs: Real All in Prices by Type and Region

Compare 2026 UK house extension prices per m², regional uplifts and full all in budgets. Includes VAT, fees, contingency and West Midlands examples.

Budget a Rear Extension in 2026, UK Costs & Midlands Checklist
September 17, 2026

Budget a Rear Extension in 2026, UK Costs & Midlands Checklist

Practical 2026 UK rear extension budgeting: per m² cost bands, fees, contingency and a step by step checklist with Midlands examples.

Extension Planning Drawings: Budget for Two Packs, Use Design and Build
September 16, 2026

Extension Planning Drawings: Budget for Two Packs, Use Design and Build

UK homeowners: learn what planning and Building Regulations drawings must include, why to budget for two drawing packages, and why a coordinated design...

Why Side Return Extensions Cost More per m² in the UK
September 15, 2026

Why Side Return Extensions Cost More per m² in the UK

Understand what drives side‑return extension cost in the UK: why per‑m² rates run higher, the London uplift, and what to check when comparing builder quotes.

Avoid Refusal: Front Extension Permitted Development in West Midlands
September 14, 2026

Avoid Refusal: Front Extension Permitted Development in West Midlands

West Midlands guide to front extension permitted development. Know the 3m² porch limit, when full permission is required, and how a managed team saves weeks.

900mm Rule for Homeowners: Island or Peninsula?
September 13, 2026

900mm Rule for Homeowners: Island or Peninsula?

Measurement first, trade tested kitchen advice: the 900mm rule, real service cost realities, and when an extension beats squeezing an island.